Free-Mo S Scale

West Avenue Branch

West Avenue Branch

Planning

Phase 2 will focus on the area East of Heileman Brewery crossing West Avenue. This module is slightly longer. This phase will be 20 feet long in 5 foot sections. Construction of this phase is set to begin in late 2025.

Proposed Trackplan

Module Specifications

  • Type: Single Track Switching Puzzle
  • Length: 20 Feet
  • Width: 24 Inches
  • Track :Tomalco Code 100 main line, Code 83 siding, Code 70 industry tracks
  • Turnouts: Hand built #8 on main, #6 on siding, #6 on industry tracks using fast tracks jigs
  • Scenery: Urban switching scene with a variety of buildings and details.