West Avenue Branch
Planning
Phase 2 will focus on the area East of Heileman Brewery crossing West Avenue. This module is slightly longer. This phase will be 20 feet long in 5 foot sections. Construction of this phase is set to begin in late 2025.
Proposed Trackplan

Module Specifications
- Type: Single Track Switching Puzzle
- Length: 20 Feet
- Width: 24 Inches
- Track :Tomalco Code 100 main line, Code 83 siding, Code 70 industry tracks
- Turnouts: Hand built #8 on main, #6 on siding, #6 on industry tracks using fast tracks jigs
- Scenery: Urban switching scene with a variety of buildings and details.
