Second Street
Planning
Phase 1 of the build will focus on the area along 2nd Street and feature street running. This module will be 15 feet long in 5 foot sections. This length was chosen to make the sections manageable but also fit the desired track plan. Construction of this phase is set to begin in early 2025.
Proposed Track Plan

Module Specification
- Type: Single Track Switching Puzzle
- Length: 15 Feet
- Width: 24Inches
- Track: Tomalco Code 100 on the main, Code 83 on the passing siding, Code 70 on the industry tracks
- Turnouts: All hand built turnouts using Fast Tracks jigs.
- Scenery: Urban street running scene with a variety of buildings and details.
Operations
A crew will arrive with up to 10 cars to spot at local industries. The track plan features two run-around tracks but also two switch backs to make the work a little more complicated. Additionally, once a car is spotted it cannot be moved again, so working track 341 will require some planning.